I have a vsphere 4 essentials plus license which capacity for 6 CPUs.
Previously, I used 2 of HP DL385 G7, each one have 2 CPU(AMD opteron 6134, 6 core CPU). So by the essential plus license I have 2 CPU available for assign to the third machine.
Then I replace both DL385 G7 with DL380 G8. For each DL380 G8 server I have 2 CPU(Xeon E5-2690, 8 core CPU).
Then I faced an issue about license. One DL380 G8 with 2 Xeon CPU use 4 CPU license insteda of 2.
Why?
Is this because of the 8 core CPU?
How can I fix this if i want to add the third server?
If I upgrade to 5.1 then I will face the same issue or not?